Wednesday, October 20, 2010

2003 Nissan 350Z GReddy Turbo Kit (VQ35DE) Twin TD05-18G 8cm2

10:57 PM by onesecond ·
Factory Parts Removal
When removing the stock parts, make sure you read over the factory repair manual for proper procedures.
- Disconnect the negative terminal of the battery.
- Drain the engine oil, coolant and power steering fluid.
- Disconnect the air flow meter.
- Remove the Air cleaner assembly with airflow meter, intake tube, and breather hose.
- Remove the Top Radiator Hose and the Water Pipe (Located above the Right Exhaust manifold).
- Disconnect the primary and secondary O2 sensor and remove the exhaust manifold and catalytic converter.
- Remove the exhaust manifold.
- Remove oil pan (Please refer to the factory service manual for detail instructions f or removing the oil pan.)
- Remove the upper intake manifold collector, fuel rail assembly with injectors and regulator.
Turbo Kit Installation
Thermo Cloth Installation
Remove the bracket securing the fuel line right below the right side shock tower and disconnect the fuel line. Flip the connector so that the line points up and reconnect the line. Double wrap the fuel and evap Line using safety Wire. Leave the top bracket off and secure the bottom back on as shown.
Important!
Make sure that the fuel line is secured away from the turbine housing when the turbo is installed. Some bending of the lines is necessary to achieve good clearance.
Make sure the lines are properly wrapped twice.
Make sure to use safety wire to wrap the thermo cloth. Zip ties will melt from the heat and eventually will come off.
Make sure that the fuel line connector is properly clicked in all the way. GReddy Performance Products, Inc. will not be responsible for any damage caused due to improper installation.

Source

0 comments:

Post a Comment

Blog Archive