The Edelbrock Nissan 350Z Performer EFI Nitrous System (Part Number 71007) is designed for 2003-Later Nissan 350Z vehicles equipped with stock 3.5L engines that utilize the returnless style fuel system. Horsepower and torque increases can vary with equipment upgrades and modifications.
Showing posts with label nozzle. Show all posts
Showing posts with label nozzle. Show all posts
Wednesday, December 22, 2010
2003-Up Nissan 350Z Edelbrock Nitrous System
12:48 AM by onesecond
·
0
comments
Labels: bottle brackets, edelbrock, electrical components, empty bottle, equipment upgrades, fuel system, horsepower, maf, mass air sensor, mounting brackets, Nissan, nissan 350z, nitrous system, nozzle, rubber insulators, solenoid, steel bottle, throttle body, torque, torque increases
Labels: bottle brackets, edelbrock, electrical components, empty bottle, equipment upgrades, fuel system, horsepower, maf, mass air sensor, mounting brackets, Nissan, nissan 350z, nitrous system, nozzle, rubber insulators, solenoid, steel bottle, throttle body, torque, torque increases
Monday, May 17, 2010
1999 Mercedes Benz Truck ML 430 AR68.10-P-1000GH Remove/Install Instrument Panel
8:26 PM by onesecond
·
0
comments
Labels: air distribution, bottom section, caution danger, flap, instrument cluster, instrument panel, Mercedes Benz, mercedes benz truck, ml 430, nozzle, pillar, screws, special tools, sun sensor, temperature sensor
Labels: air distribution, bottom section, caution danger, flap, instrument cluster, instrument panel, Mercedes Benz, mercedes benz truck, ml 430, nozzle, pillar, screws, special tools, sun sensor, temperature sensor
Removing And Installing Instrument Panel
Remove/Install
1 Remove instrument panel bottom section (1()
2 Remove A-pillar trim on left and right
3 Remove upper section of air outlet panel (1) Long wedge: See Special Tools below.
4 Unscrew screws (3) from upper side of instrument panel
5 Remove instrument cluster (A1 remove
6.1 Disconnect sun sensor connector
NOTE: Only as of 01.09.01: Connector is located behind instrument cluster
Remove/Install
1 Remove instrument panel bottom section (1()
2 Remove A-pillar trim on left and right
3 Remove upper section of air outlet panel (1) Long wedge: See Special Tools below.
4 Unscrew screws (3) from upper side of instrument panel
5 Remove instrument cluster (A1 remove
6.1 Disconnect sun sensor connector
NOTE: Only as of 01.09.01: Connector is located behind instrument cluster
Wednesday, May 5, 2010
Water/Methanol Injection System for Chevy Cobalt SS/Iion Redline and All Ecotech Engines
11:47 PM by onesecond
·
0
comments
Labels: chassis, Chevrolet, chevy cobalt, chevy cobalt ss, connect one, ecotech engines, fluid reservoir, ground location, improper operation, location source, nozzle, PDF Download, ports, power source, redline, reservoirs, secure connection, solenoid, throttle plate, water methanol injection
Labels: chassis, Chevrolet, chevy cobalt, chevy cobalt ss, connect one, ecotech engines, fluid reservoir, ground location, improper operation, location source, nozzle, PDF Download, ports, power source, redline, reservoirs, secure connection, solenoid, throttle plate, water methanol injection
Solenoid Upgrade (optional)
The optional Solenoid Upgrade (#40060) is required if the nozzle is to be installed after the intake throttle plate (as shown), or the fluid reservoir is mounted higher then the nozzle. It is highly recommended for trunk-mount reservoirs.
Finger thread the two 1/8” NPT quick connect fittings into ports labeled IN and OUT on the solenoid. Tighten an additional half turn past finger tight.
The optional Solenoid Upgrade (#40060) is required if the nozzle is to be installed after the intake throttle plate (as shown), or the fluid reservoir is mounted higher then the nozzle. It is highly recommended for trunk-mount reservoirs.
Finger thread the two 1/8” NPT quick connect fittings into ports labeled IN and OUT on the solenoid. Tighten an additional half turn past finger tight.
Subscribe to:
Posts (Atom)