2001 ENGINE PERFORMANCE' 'Basic Diagnostic Procedures Ignition Coil Test (Accord 2.3L & CR-V)
1. Turn ignition off. Remove distributor cap, rotor and leak cover. Remove primary leads from ignition coil. Using an ohmmeter, check primary resistance between ignition coil terminals "A+" and "B-". See Fig. 12 . Resistance should be as specified. See IGNITION COIL RESISTANCE table. 2. Check secondary resistance between ignition coil terminal "A+" and secondary output terminal (ignition coil tower). See IGNITION COIL RESISTANCE table. If readings are not as specified, replace ignition coil.
Showing posts with label coil ignition. Show all posts
Showing posts with label coil ignition. Show all posts
Monday, May 31, 2010
2001 Honda Accord EX Ignition Checks
3:36 AM by onesecond
·
0
comments
Labels: battery voltage, checks, coil ignition, coil resistance, continuity, cr, diagnostic procedures, distributor cap, engine performance, Honda, honda accord, honda accord ex, icm, pin connector, primary resistance, rotor, wiring diagrams
Labels: battery voltage, checks, coil ignition, coil resistance, continuity, cr, diagnostic procedures, distributor cap, engine performance, Honda, honda accord, honda accord ex, icm, pin connector, primary resistance, rotor, wiring diagrams
Monday, May 17, 2010
1990 BMW 750iL (E32/2) Fuse and Fusible Link Locations
12:45 AM by onesecond
·
0
comments
Labels: 1990 bmw 750il, BMW, bmw 750il, catalyst, coil ignition, component index, fuse, fusible link, lumber, power distribution
Labels: 1990 bmw 750il, BMW, bmw 750il, catalyst, coil ignition, component index, fuse, fusible link, lumber, power distribution
Layout Of Rear Power Distribution Box Fuse Assignments : Fuse Assignments: 1 To 4 Door Lock – Fuel Injector Fuel Injector – Ignition Coil Ignition Coil – Park Brake Park Heating – Seat Lumber Seat Lumber – Trunk Lock Underhood – Wiper Component Index
Subscribe to:
Posts (Atom)