The elegant modern pavilion, designed by the Weedon Partnership in collaboration with Austrian pre-fabrication specialists Holzbau Saurer, has been built using the latest construction technology and is a showcase for environmentally sustainable design. The architecture is modern and uncompromising, making extensive use of structural wood and large expanses of glass. The modular wooden structure has been sourced from managed forests in Austria and Switzerland. The studio has taken just six months to build and only 12 months to complete from its design conception to realisation.
Showing posts with label work spaces. Show all posts
Showing posts with label work spaces. Show all posts
Wednesday, March 10, 2010
2008 Aston Martin Design Studio
3:50 PM by onesecond
·
0
comments
Labels: Aston Martin, construction technology, conventional systems, design conception, environmental technologies, fabrication specialists, ground water system, low energy, patina, private viewings, public foyer, quality woods, reichman, saurer, sedum roof, sustainable design, vip area, weedon, wooden structure, work spaces
Labels: Aston Martin, construction technology, conventional systems, design conception, environmental technologies, fabrication specialists, ground water system, low energy, patina, private viewings, public foyer, quality woods, reichman, saurer, sedum roof, sustainable design, vip area, weedon, wooden structure, work spaces
The elegant modern pavilion, designed by the Weedon Partnership in collaboration with Austrian pre-fabrication specialists Holzbau Saurer, has been built using the latest construction technology and is a showcase for environmentally sustainable design. The architecture is modern and uncompromising, making extensive use of structural wood and large expanses of glass. The modular wooden structure has been sourced from managed forests in Austria and Switzerland. The studio has taken just six months to build and only 12 months to complete from its design conception to realisation.
Subscribe to:
Posts (Atom)